Solar systems engineered for Karnataka's grid, not just its sunlight.
From a single rooftop in Mangaluru to a multi-acre commercial array, Pyramid Enterprises handles design, DISCOM paperwork, installation and net-metering — start to switched-on.
We handle the paperwork as carefully as the panels.
Most solar delays in Karnataka happen at the DISCOM desk, not on the roof. We pre-fill your net-metering application, track it through inspection, and only hand over once your meter is actually running backwards.
- Site survey with shading and load analysis before any quote
- DISCOM-specific documentation for MESCOM, BESCOM, CESCOM, HESCOM and GESCOM
- PM Surya Ghar subsidy filing handled alongside your installation
- Annual maintenance plans with panel cleaning and inverter health checks
Three ways onto the grid
Every install starts the same way — a site visit and a load study — then branches based on where the panels are going up.

Rooftop solar for homes
1 kW to 10 kW systems sized against your last 12 months of electricity bills, with subsidy paperwork filed for you.

Rooftop & ground-mount arrays
Open-access and captive systems for factories, warehouses and offices, with structural and shading studies included.

Cleaning, monitoring, repairs
Scheduled panel cleaning, inverter diagnostics and generation monitoring for systems we've installed — or ones we didn't.
PM Surya Ghar: Muft Bijli Yojana
India's central rooftop solar subsidy is filed alongside your DISCOM net-metering application — we handle both together.
Up to ₹78,000 central subsidy, credited straight to your bank account
Households can claim up to 300 units of free electricity a month under the scheme. Subsidy is disbursed after DISCOM commissioning and typically lands within 4–6 weeks — we track the application status until it's paid out.
Five stages, one point of contact
This is a genuine sequence — each stage depends on DISCOM sign-off from the one before it.
Site survey & load study
Roof orientation, shading, structural check and 12-month consumption analysis to size the system correctly.
Design & proposal
Panel layout, inverter selection and a line-item quote, including the subsidy you're eligible for.
DISCOM application & installation
Net-metering paperwork filed with your DISCOM while our crew installs racking, panels, wiring and the inverter.
Inspection & net-meter fitting
DISCOM inspects the installation and swaps in a bi-directional meter that records what you export.
Commissioning & subsidy claim
System switched on, generation dashboard handed over, and your PM Surya Ghar subsidy claim submitted.
Register here!
Pick your electricity board to start (or check the status of) your net-metering application directly on the official DISCOM portal.
On the roof, not just on paper
What customers tell us after commissioning
"The BESCOM net-metering step is where our neighbour's installer got stuck for months. Pyramid's team tracked ours through inspection in about three weeks."
"Our factory roof needed a structural check before anyone would quote us a number. Pyramid did that first, then priced the array around it."
"Subsidy paperwork was the part I dreaded most. They filed it alongside the installation and it landed in our account without us following up once."
Sample customer feedback shown for illustration — swap in your own quotes and photos as reviews come in.
Already a customer? Pay your invoice online.
Bank transfer, UPI or card — settle your installation or AMC invoice without waiting for a site visit.
Talk to Pyramid Enterprises
Send your electricity bill and a rooftop photo — we'll come back with an honest read on whether solar makes sense for your property.
pyramidenterprisesloop@gmail.com
+91 89710 20807
Mangaluru · Bengaluru · Mysuru · Hubballi · Kalaburagi & surrounding taluks
MESCOM
BESCOM
CESCOM
HESCOM
GESCOM