Empanelled rooftop & commercial installer

Solar systems engineered for Karnataka's grid, not just its sunlight.

From a single rooftop in Mangaluru to a multi-acre commercial array, Pyramid Enterprises handles design, DISCOM paperwork, installation and net-metering — start to switched-on.

5DISCOM regions covered
25+yrs combined field experience
<90dsurvey to commissioning
6:00 IST9:00Peak generation15:0018:00
MESCOM · Mangaluru BESCOM · Bengaluru CESCOM · Mysuru HESCOM · Hubballi GESCOM · Kalaburagi
Technician installing rooftop solar panels under a clear sky
28 pairs of hands on every roof — from survey to commissioning
Why property owners choose us

We handle the paperwork as carefully as the panels.

Most solar delays in Karnataka happen at the DISCOM desk, not on the roof. We pre-fill your net-metering application, track it through inspection, and only hand over once your meter is actually running backwards.

  • Site survey with shading and load analysis before any quote
  • DISCOM-specific documentation for MESCOM, BESCOM, CESCOM, HESCOM and GESCOM
  • PM Surya Ghar subsidy filing handled alongside your installation
  • Annual maintenance plans with panel cleaning and inverter health checks
What we install

Three ways onto the grid

Every install starts the same way — a site visit and a load study — then branches based on where the panels are going up.

Workers installing solar panels on a residential rooftop
01 · Residential

Rooftop solar for homes

1 kW to 10 kW systems sized against your last 12 months of electricity bills, with subsidy paperwork filed for you.

Typical size: 2–5 kW · Payback: ~4–6 yrs
Large solar array installed on a commercial building roof
02 · Commercial & industrial

Rooftop & ground-mount arrays

Open-access and captive systems for factories, warehouses and offices, with structural and shading studies included.

Typical size: 25 kW–1 MW · Net-metering & group captive
Technician inspecting solar panels during a maintenance visit
03 · Operations & maintenance

Cleaning, monitoring, repairs

Scheduled panel cleaning, inverter diagnostics and generation monitoring for systems we've installed — or ones we didn't.

Visits: Quarterly / on-call · Remote generation alerts
Government support

PM Surya Ghar: Muft Bijli Yojana

India's central rooftop solar subsidy is filed alongside your DISCOM net-metering application — we handle both together.

Up to ₹78,000 central subsidy, credited straight to your bank account

Households can claim up to 300 units of free electricity a month under the scheme. Subsidy is disbursed after DISCOM commissioning and typically lands within 4–6 weeks — we track the application status until it's paid out.

₹30kfor 1 kW
₹60kfor 2 kW
₹78k3 kW & above
Figures per the PM Surya Ghar Muft Bijli Yojana as published on pmsuryaghar.gov.in; subsidy slabs and processing timelines are set by the Ministry of New & Renewable Energy and may be revised — we'll confirm the current figures for your application.
How an install actually runs

Five stages, one point of contact

This is a genuine sequence — each stage depends on DISCOM sign-off from the one before it.

01

Site survey & load study

Roof orientation, shading, structural check and 12-month consumption analysis to size the system correctly.

02

Design & proposal

Panel layout, inverter selection and a line-item quote, including the subsidy you're eligible for.

03

DISCOM application & installation

Net-metering paperwork filed with your DISCOM while our crew installs racking, panels, wiring and the inverter.

04

Inspection & net-meter fitting

DISCOM inspects the installation and swaps in a bi-directional meter that records what you export.

05

Commissioning & subsidy claim

System switched on, generation dashboard handed over, and your PM Surya Ghar subsidy claim submitted.

Solar rooftop portals

Register here!

Pick your electricity board to start (or check the status of) your net-metering application directly on the official DISCOM portal.

These links open each DISCOM's own SRTPV portal in a new tab. Have your consumer number and a recent electricity bill ready before you start.
From recent installs

What customers tell us after commissioning

"The BESCOM net-metering step is where our neighbour's installer got stuck for months. Pyramid's team tracked ours through inspection in about three weeks."

SR
Sunitha R.Whitefield, Bengaluru

"Our factory roof needed a structural check before anyone would quote us a number. Pyramid did that first, then priced the array around it."

AK
Anil KamathBaikampady, Mangaluru

"Subsidy paperwork was the part I dreaded most. They filed it alongside the installation and it landed in our account without us following up once."

PD
Prakash D.Vidyanagar, Hubballi

Sample customer feedback shown for illustration — swap in your own quotes and photos as reviews come in.

Already a customer? Pay your invoice online.

Bank transfer, UPI or card — settle your installation or AMC invoice without waiting for a site visit.

Go to payments
Connect with our engineers

Talk to Pyramid Enterprises

Send your electricity bill and a rooftop photo — we'll come back with an honest read on whether solar makes sense for your property.

Service area
Mangaluru · Bengaluru · Mysuru · Hubballi · Kalaburagi & surrounding taluks

This demo form isn't wired to email or a CRM yet — connect it to your backend of choice before going live.